Dellside, Co Durham

Turn Key

Client: PBH
Consultants: Evolve Architectural Services Ltd, Solmek Geotechnical & Environmental Design, Proaxis Housing Consultants & Building Design Northern Ltd – Dendra Consulting Ltd
Project Value: £1.37m

Construction of a mix of 3 bedroomed 2 storey dwellings & 4 bedroom detached homes with integral garages along with the creation of new highway & adoptable drainage inclusive of large on site attenuation. This brownfield site had a large existing building forming bat habitation roosts. The building was demolished & recycled on site in a drive to lessen the environmental impact, due to the Bat Roosts this had to strategically timed works.

Read Full Case Study

New Brancepeth, Co Durham

Turn Key

Client: PBH
Consultants: Architectural Base Consultancy Ltd – Arc Environmental - Building Design Northern Ltd – Dendra Consulting Ltd
Project Value: £920k

Construction of 7no. Three bedroom 2.5 storey dwellings & 2no. Four bedroomed 2.5 storey dwellings with associated adopted parking court & attenuation drainage. Separate easement agreements had to negotiated & secured to run the sites drainage across third party land.

Read Full Case Study

Previous Works

Bay Horse, North Yorks

Traditional Tender Package

Client: Banner Contracts (Halnaby) Ltd
Consultants: Evolve Architectural Services Ltd
Project Value: £460k

Original contract was for the conversion of the existing buildings envelope into 2 homes & the construction of a new build home within the pubs parking area. Part of the existing building was in such a dilapidated state after investigation during works that a partial demolition of the structure had to take place creating a full new build instead of conversion to one dwelling.

Read Full Case Study

Roddymoor, Co Durham

Turn Key

Client: PBH
Consultants: Evolve Architectural Services Ltd & Solmek Geotechnical & Environmental Design
Project Value: £540k

Construction of 3 two storey 3 bedroom dwellings along with associated hard and soft landscaping, Highways works & pumping station.

Ushaw Moor, Co Durham

Turn Key

Client: PBH
Consultants: Architectural Base Consultancy Ltd – Arc Environmental – Ebsford Environmental – Building Design Northern Ltd
Project Value: £540k

Construction of 6 two storey 3 bedroom dwellings along with associated soft landscaping, highway and parking areas. This brownfield site was heavily contaminated with hydro-carbons & Japanese Knotweed. Prior to construction heavy remediation works were undertaken to strip the ground back to a uncontaminated level.

Read Full Case Study

Bolton On Swale, North Yorks – Conversion & Double Garage

Traditional Tender Package

Client: Private
Consultants: Evolve Architectural Services Ltd
Project Value: £100k

Extension & Conversion of existing building to create 3 bedroom family home. The existing building was extended to the side and to the storey height with the addition of stubbed attic trusses creating a second storey. Internally a new sub-structure was created inside the existing buildings envelope along with a timber framed ground floor construction allowing the creation of a new energy efficient living space to be installed within the original & extended façade. Along with the conversion a new detached double garage was created. The site was based within a conservation area with strong planning stipulations.

Langley Moor, Co Durham

PH1 - Speculative Construction / PH2 - Design & Build

Client: Swale Valley Construction Ltd / PBH
Consultants: John Taylor Architects Ltd
Project Value: £510k

Ph1 – Construction of 3 Two Storey 3 Bedroom dwellings along with soft landscaping & off-street parking court / Ph2 – Construction of 2 semi-detached dwellings with integral garages. The site was constructed over two phases due to complex title & boundary issues.

Leeming Bar, North Yorks

Speculative Construction

Client: Swale Valley Construction Ltd
Consultants: Architectural Services Limited & Solmek Geotechnical & Environmental Design
Project Value: £300k

Construction of semi-detached 2.5 storey dwellings with detached garage block & off street parking court. The site was located upon poor ground conditions & required heavy piling.